When a BESS stops charging during an under-frequency event, it immediately removes grid demand and eases the supply gap. However, the required grid response is not uniform: a BESS may stay connected at reduced or zero power, reverse to discharge, or disconnect entirely under an approved scheme.
Recent grid events highlight why these distinctions matter. On May 13, 2026, India lost 8,963 MW of generation, causing frequency to fall from 49.953 Hz to 49.398 Hz in 19 seconds, according to reporting on NRPC findings. During the incident, plants in charging mode remained connected until dispatchers issued specific stop instructions.
Quick Answer: A BESS may reduce or stop charging in an under-frequency event because charging adds demand. Removing that demand eases the imbalance. Depending on the code and controls, it may stay connected at reduced or zero power, reverse to discharge, or disconnect. The required action varies by jurisdiction.
Three Possible Responses When a BESS Stops Charging
Frequency shows whether supply and demand match. When a BESS stops charging, reverses or disconnects, the grid sees a different power flow at the connection point.
Why Charging Counts as Grid Load
A grid holds 50 or 60 Hz only when supply equals demand. If a large plant trips, supply falls below demand and frequency drops.
A large BESS charging at full power looks like a big factory to the grid.
Operators already shed load by relay as a last resort. However, a battery that stops charging removes load without cutting off a customer.
Stop, Reverse or Disconnect
Reduce or stop charging: the BESS stays connected while drawing less power, potentially reducing charging power to zero.
Reverse to discharge: the BESS injects power. It needs stored energy, and the code and controls must allow it.
Disconnect: a breaker or feeder opens. The charging load is removed, but the disconnected BESS cannot provide power support through that connection.
These are alternatives, not stages that every installation follows.
Worked Example: A 100 MW BESS
Worked example: A BESS initially charging at 100 MW provides 100 MW of demand relief when charging stops. If it then discharges at 100 MW, the total change in power at the grid connection is 200 MW.
The 200 MW figure assumes equal charging and discharging power.
Reversal needs stored energy. A battery near its minimum state of charge can stop charging, but it cannot discharge much.
What Happens Inside a BESS During the Event
Three control layers shape the response, and each can enable or block it.
First, the power conversion system (PCS) measures grid frequency. Once it crosses a configured threshold, the PCS can reduce charge current.
A bidirectional PCS can reverse power flow through its current command. Ride-through and trip settings sit in the same controls, as our fault ride-through guide explains.
Next, the energy management system (EMS) runs the charging schedule. The plant controls must define how frequency response and the schedule interact.
Charging restarts only when recovery, reconnection and dispatch conditions are met.
Then the battery management system (BMS) sets current and voltage limits, including limits on discharge at low state of charge.
Grid-Code Rules: When a BESS Stops Charging by Region
Rules differ by region, and the wording matters. Some require disconnection, some require reduced charging, and some allow a switch to discharge.
Rules at a glance
Region / source
Trigger
Requirement or response described
India, IEGC 2023 clause 29(12)
Before the first under-frequency relay stage
Storage in charging mode disconnects automatically
Disconnect (northern report); switch to discharge or disconnect (western report); confirm the governing scheme
Texas (ERCOT) Operating Guide section 4.5.3.3
Energy Emergency Alert Level 3 declaration
Suspend charging, subject to dispatch, frequency-response and co-located-generation exceptions
FERC Order 842 framework / CAISO LGIA example
Frequency outside the droop deadband
Reduce charging rate per droop; no required flip to discharge unless droop requires it and the battery can; SOC range and operating conditions apply
India: Disconnection Is the Stated Requirement
India’s 2023 grid code, in clause 29(12), requires storage in charging mode to disconnect automatically. It must act before the first stage of under-frequency relays operates.
In the May 2026 event, reporting says that first stage sat at 49.4 Hz and the batteries stayed connected. Operators then gave manual instructions, which produced about 650 MW of load relief.
India: Reported Instructions Cite Different Thresholds
That western report also references a National Power Committee-approved scheme. Confirm the governing scheme and approved settings for the individual project.
Northern reporting says the dispatch center advised tripping the 33 kV feeders by relay. Western reporting says reconnection may follow once frequency settles within 50.00 ± 0.2 Hz.
A June 2026 northern instruction, as reported, also named a 50 ms delay. That delay belongs to that instruction, not to Indian rules in general.
Texas: Emergency-Level Charging Suspension
This ERCOT charging-suspension requirement is tied to an emergency declaration rather than a frequency-relay threshold. During Energy Emergency Alert (EEA) Level 3, ERCOT generally requires storage to suspend charging.
The Nodal Operating Guides, section 4.5.3.3, list exceptions. They cover a charging dispatch instruction, active frequency response, and some co-located generation setups.
U.S. Interconnection: Droop Sets the Direction
FERC Order 842 requires new generating facilities, including storage, to be able to give primary frequency response. The final rule sets that requirement.
A CAISO presentation shows the pro forma interconnection language for a charging storage resource. Under-frequency deviations make it decrease its charging rate according to its droop parameter.
The same language says the resource need not switch between charging and discharging. It must switch only where droop and deadband require it and the battery is technically capable.
Each interconnection agreement also defines the state-of-charge operating range and operating conditions under which primary frequency response is required. These terms apply to new interconnections, so existing resources and other regions may differ.
Other Reasons Why a BESS Stops Charging in Frequency Events
Grid code is not the only cause. Hardware, protection, and control limits can also explain why a BESS stops charging, sometimes by accident.
First, some sites sit on a feeder that load-shedding relays trip. The breaker opens, and charging stops with everything else on that feeder, which also removes any chance of discharge support.
Second, the PCS has set protection for low frequency. Coordinate it with the required charging response and applicable ride-through obligations.
Use the project’s approved thresholds and delays rather than assuming a universal sequence. Grid codes define these trip thresholds and delays by region.
Third, grid-following inverters track the grid with a phase-locked loop. On weak grids or in fast swings, that tracking can slip and force a trip.
Last, state of charge matters. A full battery stops charging on its own, and an empty battery cannot discharge.
Commissioning Checklist
Since settings differ by project, the checklist starts with the rules, not a number.
Find the grid code, protection, dispatch and reconnection rules that apply.
Confirm the required action: reduce charging, stop charging, reverse, or disconnect.
Record the approved thresholds, delays and operating logic for the project.
Define how frequency controls work with charging schedules and battery limits.
Specify when recovery, reconnection and charging restart may happen.
Test the full control and protection sequence against the approved rules during commissioning.
Charging is demand, and removing it helps reduce the supply and demand imbalance.
Reducing charging, reversing and disconnecting are different responses, and the applicable code decides which one applies.
India's 2023 code requires charging storage to disconnect before the first relay stage.
Reported implementation instructions cite different thresholds; confirm the scheme and approved settings that apply to the project.
Texas generally suspends storage charging in EEA Level 3, with listed exceptions.
Treat reported delays and thresholds as project settings, not universal values.
Charging is demand, and removing it helps reduce the supply and demand imbalance.
Reducing charging, reversing and disconnecting are different responses, and the applicable code decides which one applies.
India’s 2023 code requires charging storage to disconnect before the first relay stage.
Reported implementation instructions cite different thresholds; confirm the scheme and approved settings that apply to the project.
Texas generally suspends storage charging in EEA Level 3, with listed exceptions.
Treat reported delays and thresholds as project settings, not universal values.
Frequently Asked Questions
These answers cover common questions about when a BESS stops charging in an under-frequency event.
When a BESS Stops Charging, Does It Also Disconnect?
No, not always. It may stay connected while drawing less power, reverse, or disconnect, depending on the code and plant controls.
Should a BESS Discharge Instead of Just Stopping?
Discharge gives additional relief, but it needs available energy and a code and control setup that allow it. Some rules require disconnection instead.
Which Frequency Triggers the Response?
The applicable code or approved scheme decides. Reported Indian instructions cite 49.6 Hz and 49.5 Hz, so confirm the scheme and approved settings for your project.
Does Battery Health Suffer When a BESS Stops Charging?
Stopping a charge is a normal control action, and the BMS enforces current and voltage limits. For repeated switching, check the battery maker’s guidance.
When Does Charging Resume?
Charging restarts only when recovery, reconnection and dispatch conditions are met. Reported western Indian guidance ties reconnection to frequency settling in the normal band, and your operator may add approval steps.
Further Reading
These SunLith guides and outside sources go deeper on frequency response and grid compliance.
Grid forming vs grid following BESS is the most important inverter control decision in battery storage today. In April 2025, Spain and Portugal lost power within minutes. The cascade knocked out supply across most of the Iberian Peninsula. Investigators found one root cause: too many grid-following inverters and not enough grid-forming ones to arrest the frequency collapse.
📌 QUICK DEFINITION
What is the difference between grid forming and grid following BESS?
The fundamental difference between grid forming and grid following BESS lies in their reference source. A grid following (GFL) BESS operates as a controlled current source. It requires an existing, stable grid voltage and frequency to lock onto via a Phase-Locked Loop (PLL). Conversely, a grid forming (GFM) BESS acts as an independent voltage source. By synthesising its own internal reference, it can operate on weak grids or completely isolated networks.
That event changed the industry conversation permanently. For developers, engineers, and asset owners, this choice now carries regulatory, financial, and grid-safety consequences — not just technical ones.
This guide covers everything you need to make the right decision. We break down how each inverter type works before comparing them head-to-head. From there, you will explore optimal applications, hybrid architectures, 2025 mandates, and real-world case studies.
01
Grid Forming vs Grid Following BESS: Quick Decision Checklist
Most developers already know both technologies exist. So start here, not with theory. Answer these five questions — each answer points to the right grid forming vs grid following BESS choice.
Question 1 — Short Circuit Ratio (SCR): Choosing Grid Forming vs Grid Following BESS
📌 QUICK REFERENCE — BESS SELECTION BASED ON SCR
Short Circuit Ratio (SCR)
Recommended BESS Inverter Control Mode
SCR ≥ 3.0
Grid Following BESS — Standard, highly stable
SCR 1.5 to 3.0
Grid Following BESS with stability study — consider Hybrid
SCR < 1.5
Grid Forming BESS — Required for voltage stability
SCR ≤ 1.0
Grid Forming BESS using Power Synchronisation Control (PSC)
Question 2 — Does Your BESS Project Need Black Start or Islanding?
No — grid following BESS is sufficient
Occasional backup power only — grid following plus STS works well
Sustained islanding or off-grid — grid forming BESS is required
Question 3 — What Is the Renewable Penetration at Your Grid Connection?
Below 50% IBR penetration — grid following BESS is fine
50 to 70% IBR penetration — hybrid grid forming and grid following is recommended
Above 70% IBR penetration — grid forming preferred; may be mandated
Question 4 — Is a Grid Forming BESS Mandate Active in Your Jurisdiction?
USA (MISO territory), EU, or Australia — check mandate applicability before specifying
Other markets — monitor; mandates are spreading globally
No mandate yet — grid following remains fully eligible today
Question 5 — What Is Your BESS Project Timeline?
3 to 5 years, strong urban grid, C&I focus — grid following BESS maximises ROI today
10 or more years, utility scale — future-proof with grid forming or hybrid
Bottom line: Strong urban grid + no islanding + C&I project = grid following BESS. Weak grid + black start + high-IBR or mandate zone = grid forming BESS. Utility-scale with a long horizon = specify grid forming firmware from Day 1.
A grid following BESS inverter acts as a controlled current source. Its job is to inject active power and reactive power into the grid at the exact voltage and frequency already running there. To do this, it relies on a Phase-Locked Loop (PLL). The PLL reads the grid voltage, frequency, and phase angle at the Point of Common Coupling thousands of times per second — then locks the inverter’s internal reference to that signal. Because of this, the inverter follows the grid rather than setting it.
Grid Following BESS: Key Strengths on Strong Grids
Grid following is the dominant technology today — about 80% of all BESS systems worldwide use this architecture. It is mature, cost-effective, and well-suited to strong-grid environments with a Short Circuit Ratio above 3. Peak demand charge reduction, time-of-use arbitrage, fast frequency response, and solar self-consumption are all well within its capabilities on a strong urban grid.
Grid Following BESS: The Fundamental Limitation
The core limit is simple: a grid following inverter needs the grid to exist. Without a stable voltage reference, the PLL has nothing to lock to. As a result, a grid following BESS cannot black-start a dead network — and it cannot sustain an islanded microgrid on its own.
Grid Forming BESS: The Voltage-Source Architecture
A grid forming BESS inverter acts as a controlled voltage source. Rather than reading and copying the grid signal, it synthesises its own voltage and frequency internally. Everything else on the network — other inverters, loads, generators — synchronises to the grid forming inverter. Because of this fundamental reversal, the inverter can operate with no external grid signal at all.
Unique Stability Capabilities of Grid Forming BESS
Black start, sustained islanding, synthetic inertia, and meaningful fault current contribution are all grid forming only capabilities. None are available from a standard grid following BESS. In Australia, 1,070 MW of grid forming BESS technology is already operating across ten sites as of mid-2025, according to AEMO.
Grid Forming BESS: Three Control Strategies Explained
Three main strategies power grid forming inverters commercially today. Droop control mimics a synchronous generator’s governor — the simplest and most widely deployed approach. Virtual Synchronous Generator (VSG) explicitly emulates inertial response and reacts to both frequency deviation and Rate of Change of Frequency (ROCOF). Power Synchronisation Control (PSC) is the most advanced option, using active power as the sync signal rather than frequency — the most stable choice at very low SCR values below 1.5.
04
Grid Forming vs Grid Following BESS: Master Comparison
Grid Forming vs Grid Following BESS — 10-Dimension Head-to-Head Table
Use the table below for engineering evaluations and procurement decisions. It covers the ten dimensions that matter most when choosing between grid forming and grid following BESS.
Dimension
Grid Following BESS (GFL)
Grid Forming BESS (GFM)
Inverter behaviour
Controlled current source
Controlled voltage source
Synchronisation
PLL locks to grid voltage and frequency
Internal oscillator — no external reference
Requires grid to operate?
Yes — needs stable voltage reference
No — creates its own reference
Black start
None
Full black start capability
Sustained islanding
No
Yes — while battery has energy
Synthetic inertia
Limited — indirect only
Native — instantaneous ROCOF response
Frequency response
200–500 ms (droop-based)
< 20 ms (voltage-source response)
Minimum SCR at PCC
SCR ≥ 3; unstable below 1.5
Stable at SCR < 1.5; tested at SCR 1.0
Fault current
Very limited
Significant — supports protection coordination
Cost vs baseline
Baseline
0–20% premium (shrinking in 2025)
05
Grid Forming vs Grid Following BESS Performance Data
Grid Forming vs Grid Following BESS — EPFL Campus Study Results
Real-world data from independent research confirms the performance difference between grid forming and grid following BESS. The most rigorous comparison to date used a 720 kVA / 500 kWh BESS on the EPFL campus in Switzerland. Researchers ran both control modes on identical hardware. The result was clear: grid forming outperformed grid following on every frequency regulation metric tested.
Specifically, the grid forming inverter arrested frequency deviations before they reached protection relay trip thresholds. By contrast, the grid following inverter could only respond after the deviation was already measurable. In low-inertia conditions, those extra milliseconds compound quickly and can cause cascading failures.
Western Downs Battery: Grid Forming Upgrade Proven at 540 MW Scale
At utility scale, the Western Downs Battery in Queensland was upgraded from grid following to grid forming in March 2025. The upgrade used firmware changes — not new hardware. After the upgrade, AEMO confirmed measurable system strength improvements in the surrounding network, with voltage recovery during Fault Ride-Through events confirmed within 300 ms under grid forming control.
What the Performance Data Means for Your Grid Forming vs Grid Following BESS Decision
On strong grids with SCR above 5, the performance gap between grid forming and grid following BESS narrows considerably. For pure peak shaving or energy arbitrage on a strong urban grid, grid following performance is completely adequate. The extra cost of grid forming is not recovered through performance gains in that scenario.
However, in weak or high-IBR grids, grid forming outperforms grid following on every stability metric that matters — exactly the conditions the EPFL and Western Downs data reflect.
Engineering rule: The question is not which is better overall. It is which is better for this specific grid, at this specific node, for these specific services.
06
Commercial Costs: Grid Forming vs Grid Following BESS
Why the Grid Forming BESS Cost Premium Is Shrinking in 2025
Three factors are compressing the cost gap between grid forming and grid following BESS. First, firmware upgrades now unlock grid forming on existing grid following hardware — exactly as the Western Downs Battery proved in March 2025. Second, manufacturing volume is driving inverter costs down broadly. Third, grid forming BESS earns revenue from stability markets that grid following cannot access.
Modo Energy’s September 2025 analysis of Australia’s NEM found no real cost difference between grid forming and grid following in that market. Meanwhile, National Grid’s Stability Pathfinder programme pays specifically for synthetic inertia and system strength — both grid forming only capabilities. Over a 10-year project life, those payments more than recover any upfront premium in mandate-affected markets.
Grid Forming vs Grid Following BESS: 10-Year Financial Summary
When to Choose Grid Following BESS: 5 Project Profiles
Grid following BESS is the right choice for most projects today. Below are the five scenarios where it delivers the strongest return on investment.
Profile 1 — Grid Following BESS for C&I Peak Shaving & Demand Reduction
Manufacturing facilities, data centres, and logistics hubs on strong urban grids (SCR typically 5 to 20) are ideal for grid following BESS. A well-configured Energy Management System dispatches the battery in real time to prevent demand charge spikes, cutting bills by 30 to 40%. Add a Static Transfer Switch and the same system also delivers seamless backup power.
Profile 2 — Grid Following BESS for Solar-Plus-Storage
In solar-plus-storage systems, the solar PV inverter provides the AC voltage reference. The grid following BESS inverter runs in parallel — absorbing surplus solar and wind generation and discharging when output falls. This is a well-proven configuration deployed across thousands of sites globally.
Profile 3 — Grid Following BESS for Fast Frequency Response Markets
A grid following inverter detects frequency deviation via the PLL and responds in under 200 to 500 milliseconds. That is well within the threshold for FFR products in most grid codes. As a result, grid following BESS is fully eligible and actively operating in FFR markets in Great Britain, Australia, Ireland, and the United States.
Profile 4 — Grid Following BESS for Capacity Market Participation
Grid following BESS can provide committed MW capacity through auctions in the UK, US, and Australia. Combined with energy arbitrage strategies and FFR, capacity payments create a strong multi-revenue stack without requiring grid forming capabilities.
Profile 5 — Grid Following BESS for Time-of-Use Energy Arbitrage
In liquid spot markets — ERCOT, Australia’s NEM, GB day-ahead — significant arbitrage value comes purely from charge and discharge timing. A well-configured Battery Management System and EMS handle this automatically. Grid following is the lower-cost, right-fit choice for this application.
08
When to Choose Grid Forming BESS: 5 Project Profiles
📌 KEY SCENARIOS — WHEN IS GRID FORMING REQUIRED?
When do you need a grid forming BESS?
A grid forming BESS is technically required or recommended over a grid following system in the following scenarios:
Weak Grid Integration: When the Short Circuit Ratio (SCR) at the Point of Common Coupling (PCC) falls below 2.0 or 1.5.
Island Microgrids: For remote, off-grid systems that have no utility grid to provide a voltage reference.
Black Start Capability: When the battery system must independently energise a completely dead network.
High Renewable Penetration: In grid zones where inverter-based resource (IBR) penetration exceeds 60% to 70%.
Stability Market Revenue: To participate in specialised grid services like synthetic inertia and system strength contracts.
Grid forming BESS is not optional in these scenarios. In each case it is technically required or the only viable choice. Here is the detail behind each one.
Profile 1 — Grid Forming BESS for Weak Grid and Remote Industrial Sites
Grid following inverters typically become unstable when the SCR at the PCC falls below 2. In fact, dropping below SCR 1.5 risks triggering sub-synchronous oscillations if multiple grid following units run in parallel — a real engineering risk at remote mining operations, oil and gas facilities, and industrial sites on long radial feeders. For a full breakdown of why this happens, read our comprehensive guide to grid-following BESS stability.
Profile 2 — Grid Forming BESS for Island Microgrids and Off-Grid Systems
An islanded microgrid has no utility grid to provide a voltage reference — so a grid following inverter cannot operate on its own there. The grid forming BESS becomes the grid itself. It creates and holds the voltage and frequency reference that all other devices synchronise to.
Profile 3 — Grid Forming BESS for Black Start Requirements
A grid following inverter cannot energise a dead network. A grid forming inverter can. For any project where black start is a design requirement — contractual, regulatory, or operational — grid forming is the only technology that delivers this capability. There is no workaround or hybrid substitute for this specific requirement.
Profile 4 — Grid Forming BESS for High-IBR Grid Zones
As renewable penetration rises above 60 to 70%, grid following inverters in aggregate no longer have a stable signal to lock to without grid forming support. The April 2025 Iberian blackout was a direct consequence of this imbalance. Grid forming BESS, combined with a well-specified Power Conversion System, is the primary technical response.
Profile 5 — Grid Forming BESS for Stability Market Revenue
Grid forming inverters are the only technology eligible for stability market contracts — synthetic inertia in the UK Stability Pathfinder, System Strength services in Australia’s NEM, and fast FCAS premiums. These revenue streams are grid forming only. If your business model includes stability market products, grid forming is not an optional upgrade. It is the core product.
09
The Hybrid Option: Grid Forming and Grid Following BESS Together
How a Hybrid Grid Forming and Grid Following BESS Architecture Works
The choice between grid forming vs grid following BESS is increasingly not a binary one. Modern inverter platforms support both control modes in the same hardware, with automatic switching between them.
In a typical hybrid design, 20 to 30% of the BESS units operate in grid forming mode. These units establish and hold the voltage and frequency reference for the whole site. The remaining units run in grid following mode against that reference — maximising total output at lower average cost than an all-grid forming fleet.
When the utility grid is strong, the grid forming units benefit from additional system strength. Should the grid weaken or disconnect, those units hold the microgrid reference autonomously. The grid following units simply continue to follow that reference, unaware that the utility has gone.
What the Hybrid Grid Forming and Grid Following BESS System Delivers
Lower average cost than specifying all units in grid forming mode
Full black start capability from the grid forming anchor units
Seamless islanding with no manual intervention needed
Stable operation at low SCR where an all-GFL system would oscillate
Future-proofing — grid forming firmware is already on the hardware, ready when mandates arrive
Seamless Mode Switching Between Grid Forming and Grid Following BESS
Hitachi Energy’s patent filings (WO2024193866A1 and WO2024193867A1) describe supervisory control that switches individual inverter units between VSG (grid forming) and PLL (grid following) modes automatically — based on real-time voltage thresholds — without interrupting power delivery. This is production firmware, not experimental technology.
Sunlith Energy recommendation: For any new BESS project above 5 MW, specify PCS hardware with grid forming firmware capability regardless of Day 1 operating mode. The option value vastly exceeds its marginal cost.
10
Grid Forming BESS Regulatory Requirements by Market — 2025
Regulatory requirements for grid forming vs grid following BESS changed substantially in 2024 and 2025. Here is the current status across four key markets.
United States — MISO Grid Forming BESS Mandate (November 2024)
MISO finalised grid forming BESS performance requirements in November 2024. New stand-alone BESS systems seeking interconnection in MISO territory must demonstrate synthetic inertia emulation, fast frequency response, and minimum short-circuit current contribution. Grid following only systems do not meet these requirements.
In November 2025, ENTSO-E and key national regulators announced that all new storage projects above 1 MW must carry grid forming capability from 2026. Germany’s Bundesnetzagentur, France’s RTE, and Spain’s REE all signalled fast-track implementation timelines following the April 2025 Iberian blackout.
Australia — Grid Forming BESS Is Now the Industry Default
Australia has no formal mandate, but AEMO’s market design has made grid forming BESS the standard for new large-scale projects. Over 1,070 MW is already operating across ten sites. Modo Energy confirms that Australian developers now treat grid forming as a standard specification rather than an optional upgrade.
United Kingdom — Grid Forming BESS and the Stability Pathfinder
National Grid ESO’s Stability Pathfinder issues multi-year contracts for synthetic inertia and system strength — both grid forming only capabilities. Grid code updates under Engineering Recommendation G99 are underway to formally require grid forming performance specifications.
How Sunlith Energy Chooses Between Grid Forming and Grid Following BESS
At Sunlith Energy, the grid forming vs grid following BESS decision is an engineering analysis on every project — never a default. Our four-step process ensures every system is specified correctly.
SCR Analysis — We measure or obtain the SCR at the Point of Common Coupling before writing any specification. This single number anchors the grid forming vs grid following BESS recommendation.
Revenue Stack Assessment — We model the full value stack — demand charge reduction, arbitrage, FFR, capacity markets, backup power, solar self-consumption, and stability market products. This determines whether grid forming’s cost premium is recovered through incremental revenue.
Regulatory and Horizon Review — We check the applicable grid code, interconnection requirements, and announced mandates. For projects with a 10-year or longer horizon in MISO, Europe, or Australia, grid forming firmware capability is specified as standard.
PCS Hardware Specification — We select Power Conversion System hardware from manufacturers that support both grid forming and grid following firmware. This gives the system full flexibility to adapt over its lifetime without hardware replacement.
Grid Forming vs Grid Following BESS: Frequently Asked Questions
What is the main difference between grid forming and grid following BESS?
Grid following BESS reads the grid’s existing voltage and frequency and injects current to match it — it follows the grid. Grid forming BESS synthesises its own voltage and frequency reference internally — it forms the grid. The key result is that grid following needs a strong external grid to operate stably, while grid forming can function with no grid signal at all.
Can a grid following BESS be upgraded to grid forming later?
Yes, in many cases. Australia’s Western Downs Battery proves this at 540 MW scale: the 2025 upgrade used firmware changes, not new hardware. However, not all inverters support grid forming control at the firmware level. When specifying new hardware, always confirm grid forming firmware availability with your PCS manufacturer.
What SCR does a grid following BESS need to work safely?
A minimum SCR of 3 at the PCC is the standard engineering threshold for grid following BESS. A formal stability study becomes mandatory once the system drops below SCR 2. If the node falls past SCR 1.5, specifying a grid forming BESS is strongly recommended. At or below SCR 1.0, a grid forming system using Power Synchronisation Control (PSC) is your only viable option.
Is grid forming BESS now required by regulation in some markets?
Yes. MISO finalised grid forming requirements for new BESS interconnection in November 2024. Europe announced the 1 MW+ grid forming rule for 2026. Australia’s AEMO has made grid forming the de facto standard for new large-scale BESS. Developers in these markets should treat grid forming firmware as a baseline specification.
Is grid forming BESS always better than grid following BESS?
No. On strong grids with SCR above 3 and adequate synchronous generation, grid following BESS performs excellently for peak shaving, arbitrage, and FFR. The additional capabilities of grid forming add no commercial value at a well-connected C&I site. Grid forming is better where it is needed; grid following is the right choice where grid strength is not a constraint.
What happens if you use a grid following BESS on a weak grid?
Below SCR 3, grid following inverters begin to show PLL instability. Below SCR 1.5, multiple units in parallel can enter sub-synchronous oscillations — a condition that can cascade into protection trips across the network. The April 2025 Iberian blackout demonstrated exactly this failure mode at grid scale.
13
Conclusion: Choosing Grid Forming vs Grid Following BESS
The grid forming vs grid following BESS decision now carries regulatory deadlines, financial consequences, and grid-safety implications. After the April 2025 Iberian blackout, MISO’s November 2024 mandate, Europe’s 2026 rule, and Australia’s operational scale-up past 1,000 MW of grid forming BESS, this is not a decision any project developer can treat as an afterthought.
For most C&I projects on strong grids today, grid following BESS delivers faster payback, lower upfront capital, and all the commercial capabilities the project needs. For weak grids, remote sites, black start applications, high-IBR zones, and stability market participation, grid forming BESS is the technically correct — and increasingly regulatory-required — choice. For utility-scale projects above 5 MW with a long horizon, the hybrid architecture gives both capabilities at the lowest combined cost.
At Sunlith Energy, every project starts with an SCR analysis and a revenue stack model. The right grid forming vs grid following BESS specification follows from that analysis — not from a default catalogue choice.
BESS grid-forming technology is transforming how power grids stay stable. As renewable energy now accounts for more than 80% of new global capacity additions, grids are losing the mechanical inertia they once relied on. BESS grid-forming technology solves this problem directly. It lets batteries create their own voltage and frequency — rather than following the grid — so the power system stays balanced even when synchronous generators are absent. This article explains how it works, why it matters, and the $1.2 trillion market opportunity it represents.
1.4 TW Global grid-forming BESS capacity gap by 2034
$1.2T BESS investment required through 2034
5.9 TW New wind and solar capacity expected by 2034
The energy transition is working. Solar costs have fallen by over 90% in a decade. Wind farms now supply power on six continents. Yet this progress creates a serious new challenge: grids are running out of inertia.
Why Inertia Matters for Grid Stability
Traditional grids relied on large spinning generators — coal plants, gas turbines, hydro dams. Their rotating mass provided mechanical inertia. Consequently, when supply and demand shifted, the grid had several seconds to respond. Frequency stayed within safe limits: 49.5–50.5 Hz in Europe, 59.95–60.05 Hz in North America.
Solar and wind farms connect through power electronics. As a result, they add no spinning mass. Therefore, as more synchronous generators retire, frequency swings become faster and more severe. The April 2025 Iberian blackout showed exactly what this means in practice — a cascading failure knocked out power across Spain, Portugal, and parts of France.
Why BESS Grid-Forming Technology Is the Answer
BESS grid-forming technology fills the inertia gap electronically. Instead of waiting for the grid to stabilise, a grid-forming battery creates its own stable voltage and frequency. In addition, it responds in milliseconds — far faster than any thermal plant. That is why grid planners worldwide are now prioritising BESS grid-forming technology as essential infrastructure, not just a backup option.
KEY INSIGHT The April 2025 Iberian blackout reignited the global debate about grids running with too little inertia. Since then, BESS grid-forming technology has moved from ‘experimental’ to ‘strategic priority’ in market after market.
02 — What Is BESS Grid-Forming Technology?
To understand BESS grid-forming technology, it helps to start with how batteries connect to the grid. Every battery, solar farm, and wind turbine connects through a power electronic device called an inverter. The inverter controls how electricity flows onto the AC network.
Grid-Following Inverters: The Old Standard
Until recently, almost all inverters operated in grid-following mode. A grid-following inverter reads the existing voltage waveform on the network. Then it synchronises its output current to match. This approach works well when plenty of synchronous generators are providing a stable reference. However, it fails in weak grids or during blackouts because there is no waveform left to follow.
BESS Grid-Forming Technology: The New Standard
BESS grid-forming technology works differently. A grid-forming inverter does not wait for a voltage signal. Instead, it generates its own voltage magnitude and frequency using sophisticated digital control algorithms. In other words, it behaves like a voltage source rather than a current source. Furthermore, it can hold that voltage stable even when the wider grid collapses — making black start and islanded operation possible.
“BESS grid-forming technology represents a critical breakthrough for renewable energy integration. As global power demand surges 55% by 2034, GFM BESS provides the bridge between renewable abundance and grid stability.”
— Robert Liew, Research Director, Wood Mackenzie, July 2025
In short, BESS grid-forming technology gives batteries the ability to anchor the grid — not just respond to it. For a full technical breakdown, see Wood Mackenzie: Steadying the Grid.
03 — Grid-Forming vs. Grid-Following: Key Differences
The table below compares grid-forming and grid-following BESS across the capabilities that matter most for modern power networks. Notably, BESS grid-forming technology unlocks revenue streams that grid-following systems simply cannot access.
Capability
Grid-Following BESS
Grid-Forming BESS
Voltage Reference
Follows an existing grid signal
Creates its own voltage and frequency
Synthetic Inertia
❌ Not available
✅ Fully capable
Black Start
❌ Needs external reference
✅ Energises isolated networks
Weak Grid Support
⚠ Performance degrades
✅ Optimised for low short-circuit ratio
Islanding
❌ Trips on isolation
✅ Seamless island and resync
System Strength
❌ Minimal
✅ Fault current and voltage support
Fast Frequency Response
⚠ No inertia component
✅ FFR plus inertial response
Fault Ride-Through
⚠ Standard only
✅ Enhanced, phase-jump tolerant
Energy / FCAS Markets
✅ Widely deployed
✅ Same, plus premium stability revenue
Hardware Cost Premium
Baseline
~15% higher (gap narrowing fast)
The 15% Cost Premium Is Shrinking
Grid-forming hardware costs roughly 15% more than conventional BESS. This premium covers upgraded inverters, enhanced controls, and higher surge current capacity. However, battery cell prices fell 10–40% worldwide over the past year alone. Therefore, the effective cost gap is closing rapidly. Moreover, the premium stability services that BESS grid-forming technology unlocks — synthetic inertia, black start, system strength — generate significantly higher revenues. For pricing detail, see the Wood Mackenzie BESS Opportunity Report.
04 — Core Technical Capabilities of BESS Grid-Forming Technology
BESS grid-forming technology delivers six capabilities that conventional battery storage cannot match. Each one addresses a specific gap created by the shift to renewable generation.
⚡ Synthetic Inertia Electronically replicates spinning mass. When frequency shifts, stored energy is injected within milliseconds — buying time for other resources to respond.
🔄 Black Start Restarts de-energised network segments after a blackout without needing help from thermal plants. The battery creates the initial voltage from scratch.
📊 Voltage and Frequency Regulation Actively establishes and maintains both voltage magnitude and frequency — the reference signal that all other grid devices rely on.
🏝 Islanding and Resynchronisation Keeps supply stable in an isolated grid section during faults. When the fault clears, it reconnects to the main grid autonomously and without disruption.
💪 System Strength Provides short-circuit current and fault-level capacity. This is essential for connecting more renewables in areas with low grid strength.
🛡 Oscillation Damping Detects and suppresses inter-area power oscillations — a growing risk as synchronous generators retire and natural damping disappears.
Synthetic Inertia: How BESS Grid-Forming Technology Replaces Spinning Mass
Synthetic inertia is the most important capability of BESS grid-forming technology. Here is how it works. When grid frequency begins to fall, the control system detects the rate of change of frequency (RoCoF) in real time. Next, it discharges stored energy in proportion to that rate of change. As a result, the battery mimics the behaviour of a large spinning turbine — but responds ten times faster and remains active for hours rather than seconds.
The Blackhillock BESS in Scotland proves this in practice. Its grid-forming inverters deliver 370 megawatt-seconds of synthetic inertia and 116 MVA of short-circuit contribution directly to the GB transmission system. Furthermore, the system was the first battery in the world to provide full active and reactive power stability services at transmission level. Read the full story: Grid-Forming Tech on Centre Stage — PV Magazine. For the underlying AEMO technical methodology, see Quantifying Synthetic Inertia from GFM BESS (AEMO, 2024).
05 — Control Strategies Behind BESS Grid-Forming Technology
Three main control strategies power BESS grid-forming technology. Each offers different trade-offs between simplicity, performance, and compatibility with existing grid infrastructure.
1. Droop Control
Droop control is the most widely deployed strategy in BESS grid-forming technology today. It works by mimicking a synchronous generator’s natural response: when frequency drops, active power output increases automatically; when frequency rises, output falls. Similarly, voltage deviations trigger reactive power adjustments. Droop control is straightforward to deploy and coordinates well across multiple units. Therefore, it dominates utility-scale projects currently in operation.
2. Virtual Synchronous Generator (VSG)
VSG control takes the concept further. It mathematically models the full dynamic equations of a synchronous machine — including the swing equation, damping coefficient, and excitation system. Consequently, the battery produces inertial behaviour that closely mirrors a real generator. This approach integrates naturally with protection frameworks built around synchronous machines. However, it requires more careful tuning and greater computational power. For a detailed technical comparison, see GFM vs GFL — OPAL-RT.
3. Power Synchronisation Control (PSC)
PSC replaces the phase-locked loop (PLL) used in grid-following inverters with a direct synchronisation mechanism. As a result, it stays stable in very weak grids and close to faults where PLLs break down. PSC is well established in HVDC-VSC systems and is now being adapted for BESS in low short-circuit ratio environments. In addition, it is particularly suitable for remote or islanded microgrids where grid strength is inherently low.
REGULATORY NOTE IEEE Standard 2800 and NERC ride-through profiles are shaping GFM compliance in North America. In Australia, AEMO’s voluntary GFM specification splits capabilities into ‘core’ (software only) and ‘additional’ (hardware upgrades). The EU’s NC RfG is being revised to add GFM-specific testing for synthetic inertia, oscillation damping, and islanding.
06 — Global Market Opportunity for BESS Grid-Forming Technology
The market for BESS grid-forming technology is enormous — and largely unmet. Wood Mackenzie’s July 2025 analysis identified a 1,400 GW global capacity gap for grid-forming battery storage through 2034. To put that in context, $1.2 trillion of BESS investment is required over the decade to support more than 5,900 GW of new wind and solar capacity. Furthermore, global power demand is forecast to surge 55% by 2034, with over 80% of new capacity coming from variable renewables.
Australia Leads the World in Grid-Forming BESS Deployment
Australia’s National Electricity Market (NEM) is the most advanced market for BESS grid-forming technology globally. According to AEMO’s 2025 Transition Plan, ten grid-forming BESS sites with a combined output of 1,070 MW are already in operation. See our BESS grid-forming projects portfolio. Moreover, a further 94 projects — 78 standalone batteries and 16 hybrid installations — are in the development pipeline. AEMO has also explicitly identified BESS grid-forming technology as the dominant provider of fast FCAS (Frequency Control Ancillary Services) introduced in 2023. See: Australia’s GFM Pipeline — Energy Storage News.
The UK’s Stability Pathfinder: A Revenue Model for Grid-Forming BESS
In the United Kingdom, National Grid’s Stability Pathfinder programme has created long-term contracts for grid-forming services — specifically synthetic inertia and system strength. This gives developers the revenue certainty needed to finance large BESS grid-forming technology projects. As a result, the UK is building one of the most commercially mature markets for this technology outside Australia.
Saudi Arabia Sets a World Record
In December 2025, Saudi Arabia connected a 7.8 GWh grid-forming BESS — the largest in the world at commissioning — to its national transmission network. The project delivers black-start capability, virtual inertia, fast frequency response, and voltage support. Furthermore, it was completed in an extraordinarily compressed timeline, with over 1,500 PowerTitan 2.0 units manufactured in just 58 days. Read more: Saudi Arabia 7.8 GWh BESS — Energy Storage News.
07 — Real-World BESS Grid-Forming Projects in 2025–2026
These three projects confirm that BESS grid-forming technology has moved decisively from pilot stage to mainstream deployment.
Blackhillock BESS — Great Britain (200 MW / 400 MWh)
Developed by Zenobe with Wärtsilä storage and SMA grid-forming inverters, Blackhillock became the world’s first battery to deliver full active and reactive power stability services at transmission level. It sits in northeast Scotland — a region dominated by wind generation where synchronous capacity is limited. Consequently, it provides synthetic inertia and voltage stabilisation that the local grid cannot otherwise source. The project holds 62 SMA medium-voltage stations and delivers 370 MW·s of synthetic inertia and 116 MVA of short-circuit contribution.
Saudi Arabia 7.8 GWh Grid-Forming BESS
This is currently the largest BESS grid-forming project in the world. Equipped with Sungrow PowerTitan 2.0 systems, it provides black-start capability, virtual inertia, fast frequency response, and voltage support to the Saudi transmission network. In addition, the project directly supports Saudi Arabia’s Vision 2030 clean energy programme and demonstrates that BESS grid-forming technology can scale to multi-gigawatt-hour levels within short construction windows.
Dalrymple BESS — South Australia
Dalrymple is an important proof-of-concept for islanding and resynchronisation. After the main grid fails, the battery maintains stable supply to an isolated network section. Then, when the grid recovers, it adjusts its own frequency to match before reconnecting — without any disruption. This autonomous resynchronisation capability is now a standard requirement in AEMO procurement rounds. For the underlying analysis, see Hitachi Energy: Bridging the Inertia Gap.
08 — Challenges and the Path Forward
Despite strong momentum, BESS grid-forming technology faces four genuine barriers that the industry must address to close the 1,400 GW gap.
Challenge 1: Regulatory and Standards Gaps
Most grid codes were written for synchronous machines. As a result, they do not include compliance testing procedures for capabilities unique to BESS grid-forming technology — such as synthetic inertia provision, oscillation damping, and islanding. IEEE and IEC are actively drafting updates. However, regulatory change takes time, and developers face uncertainty in the interim. See the latest review: Grid Codes for GFM Inverters — ScienceDirect.
Challenge 2: Modelling Complexity
Grid-forming inverters interact with one another in complex, non-linear ways. Consequently, electromagnetic transient (EMT) simulation tools struggle to model them accurately. This slows interconnection approvals and creates risk for developers. Nevertheless, modelling tools are improving rapidly, and several grid operators have now published accepted simulation methodologies.
Challenge 3: Mandate vs. Market Debate
A live policy question remains: should BESS grid-forming technology be mandated for all new large-scale BESS projects, or left to voluntary adoption through premium revenue streams? Australia is moving toward mandate for certain connection scenarios. By contrast, the UK is using competitive procurement. The resolution of this debate will significantly affect deployment speed through 2030.
Challenge 4: Interoperability Across Manufacturers
When multiple grid-forming units from different manufacturers operate together, their control algorithms must coordinate seamlessly. Currently, interoperability standards are still being finalised. Therefore, project developers must take extra care at the design stage when mixing equipment from different vendors.
On the positive side, battery cell prices fell 10–40% globally over the past year. Additionally, inverter manufacturers are scaling production rapidly. Therefore, the cost case for BESS grid-forming technology is strengthening every quarter. The technology is no longer experimental — it is working at scale, in live transmission networks, today.
09 — Sunlith Energy’s View on BESS Grid-Forming Technology
At Sunlith Energy, we see BESS grid-forming technology as a structural shift — not an incremental upgrade. Batteries are becoming foundational grid infrastructure. For more analysis, visit our Sunlith Energy Insights page. The old view of BESS as a behind-the-meter asset or simple frequency-response tool is giving way to something more significant: batteries as the primary source of grid stability in a renewable-dominated power system.
Our Four Core Convictions
1. The Stability Gap Is Real and Urgent
The Iberian blackout was not an anomaly. It was a warning. Markets that keep adding renewables without replacing lost inertia are accumulating systemic risk. Consequently, BESS grid-forming technology is not an optional feature — it is an engineering necessity for any grid targeting high renewable penetration.
2. Revenue Stacking Makes the Economics Compelling
A grid-forming battery can simultaneously participate in energy arbitrage, fast frequency response markets, inertia procurement, system strength contracting, and black-start services. Therefore, the total revenue potential of BESS grid-forming technology significantly exceeds that of a conventional BESS asset. Moreover, as grid codes tighten, these revenue streams will grow further.
3. Falling Costs Are Changing the Calculation
The 15% hardware premium for BESS grid-forming technology is eroding as inverter volumes scale and competition intensifies. In addition, the premium services it unlocks are worth far more than the cost difference. Within the current planning horizon, we expect grid-forming to become the default specification for utility-scale BESS in all high-renewable markets.
4. Australia and the UK Are the Proving Grounds
The procurement frameworks, grid codes, and market structures being built in these two markets today will be replicated globally. Developers who build operational experience and project references now will be strongly positioned as the $1.2 trillion opportunity unfolds. Furthermore, the lessons from Blackhillock, Dalrymple, and the Australian NEM will directly inform policy in the Middle East, Southeast Asia, and North America.